JIEXI|Marine AUS40 Urea Bunkering Service at Qingdao Port

JIEXI provides fast, safe 40% marine AUS40 urea bunkering service at Qingdao Port. We finished urea injection into vessel SCR system within 2 hours after berthing, helping ships meet IMO Tier III NOx emission requirements.
Case Details

JIEXI completed AUS40 marine urea bunkering at Qingdao Port for an ocean-going vessel during a short port stay. The team supplied 40% urea solution to the vessel's onboard SCR tank, completing the operation within two hours of berthing. Safety checks, pipeline connection, quantity monitoring and document handover were coordinated around the vessel's departure schedule.


Project at a Glance

Location Qingdao Port, China
Service Marine AUS40 urea supply and bunkering
Product 40% urea solution for the vessel's SCR system
Project Challenge Complete replenishment within a tight port-call window
Completion Time Within two hours of berthing in this project
Handover Quantity confirmation, bunkering receipt and quality documents
Reported Outcome No leakage, overflow or supply-related departure delay


Vessel Requirements and Port Coordination

The vessel needed to replenish its SCR urea tank before departure. With limited time alongside, the work required advance preparation of the supply team, bunkering equipment, quality documents and port arrangements.

Using the vessel's advance ETA notice, JIEXI prepared the team and bunkering truck before arrival. This allowed the operation to begin after berthing without waiting for the supply arrangements to be made on site.


AUS40 Bunkering Procedure

  1. Pre-job preparation: The team carried out a risk assessment and arranged the port work permit and safety declaration before starting the operation.
  2. Solution quality checks: The supplied AUS40 solution was checked for the specified 40% concentration, with quality documents prepared for handover.
  3. Pipeline connection and transfer: Closed-pipeline bunkering was used with leak protection and real-time flow monitoring. Chemical protective equipment and spill-response materials were available on site.
  4. Quantity confirmation: The solution was transferred into the onboard SCR tank, the delivered quantity was confirmed and the bunkering receipt was issued.
  5. Completion and traceability: The team cleaned the work area and retained service records and a solution sample for subsequent inspection and quality follow-up.

JIEXI marine AUS40 urea bunkering operation at Qingdao Port


Project Results

The bunkering operation was completed within two hours of the vessel berthing. No leakage or overflow was reported, and replenishment did not delay the vessel's scheduled departure. The chief engineer accepted the AUS40 quality, and the case records normal SCR system operation before departure.

Advance preparation helped keep the port visit on schedule, while quantity confirmation, service records and sample retention supported a documented handover to the vessel's crew.


Coordinate Supplies for Your Port Call

For vessels requiring several services during the same port visit, JIEXI also coordinates marine chemicals, lubricants, ship stores and provisions. Include these requirements with your inquiry so the team can review them alongside the AUS40 supply request.

For a separate example of stores delivery and onboard handover, read the ship stores supply case at Jinzhou Port.


Frequently Asked Questions

What urea solution was supplied in this project?

JIEXI supplied 40% AUS40 marine urea solution to the vessel's onboard SCR tank at Qingdao Port. Include your required concentration and quality specifications when requesting supply.

Can bunkering be completed within two hours?

This project was completed within two hours of berthing after advance preparation. Timing for another vessel depends on the required quantity, berth access, connection arrangements and port schedule, and should be confirmed when booking.

What checks and records were included?

The operation included solution quality checks, flow monitoring, delivered-quantity confirmation and a bunkering receipt. Service records and a solution sample were retained for quality follow-up; tell the team about any additional document requirements before delivery.

What information is needed for a quotation?

Send the vessel name, delivery port and berth, ETA/ETD, required AUS40 quantity, tank connection details and quality-document requirements so JIEXI can review availability and delivery arrangements.

For AUS40 urea supply at Qingdao Port, Contact JIEXI for a quote with your vessel details, required quantity and port schedule.

CONTACT US

If you have any queries, get in touch today! Don't hesitate. We try to take the extra step for our customer satisfaction.
Name
Email *
Message
Verification Code *
Click to verify
Leave a message
Name
Email *
Message
Verification Code *
Click to verify