JIEXI carried out an emergency repair after two BITZER semi-hermetic air conditioning compressors failed onboard a vessel calling at Zhanjiang Port. Because the vessel had only a short berth window, the team replaced the compressors overnight before departure and continued system commissioning during the voyage to Tianjin Port.
Marine air conditioning supports crew accommodation and equipment heat dissipation. In this case, the sudden failure of two compressors caused the vessel's cooling system to stop operating normally.
The vessel's stay at Zhanjiang Port was too short for compressor replacement and full system commissioning to be completed alongside. Extending the port stay would have affected the planned voyage and increased detention costs. The shipowner therefore needed a repair arrangement that could begin in port and continue after departure.

BITZER air conditioning compressor replacement and onboard commissioning service.
After receiving the breakdown notice, JIEXI confirmed the reported fault, spare-parts availability and boarding requirements. The repair plan was prepared within two hours, and engineers, tools and consumables were dispatched to Zhanjiang Port.
The onboard inspection covered the compressors, electrical circuits, refrigerant circuit and connected pipelines. This allowed the team to review the failed units and the surrounding system before starting replacement work.
JIEXI also lists BITZER ECOLINE semi-hermetic reciprocating compressors within its marine compressor range. The exact replacement model and operating requirements should be confirmed from the vessel's existing unit, nameplate and system data before supply.
JIEXI engineers sailed with the vessel after departure and continued commissioning under operating conditions. The work included calibration and monitoring of high and low pressure, operating current, discharge temperature and overload protection.
The team also checked running stability, vibration, noise and possible hidden faults. Commissioning during navigation allowed operating data to be reviewed while the system was exposed to vessel movement and power fluctuations.
Pressure records, current data and service photographs were retained for the owner's inspection. A repair log, test report and spare-parts list formed part of the technical handover, together with guidance for the vessel's engineers on routine checks and alarm handling.
When the vessel reached Tianjin Port, both compressors were operating within the specified parameters. Final checks confirmed stable cooling performance, no leakage and no abnormal alarms.
Cabin temperature control was restored, and the air conditioning system completed its full-load acceptance test. By dividing the work between overnight replacement in Zhanjiang and commissioning during navigation, the vessel maintained its original sailing schedule without an additional port stay for this repair.
This project required coordination across two ports rather than a single alongside visit. It combined spare-parts preparation, overnight boarding, onboard replacement, voyage commissioning and final acceptance at the destination port.
For another example of time-sensitive engine room support, see JIEXI's engine room alarm and monitoring system repair at Maoming Port, where engineers completed overnight fault diagnosis, repair and functional testing during a limited port stay.
If your vessel has an air conditioning or refrigeration compressor failure, send the available equipment and schedule information so the service request can be reviewed. Helpful details include:
Contact JIEXI for marine compressor repair to discuss fault diagnosis, spare-parts availability, boarding arrangements and the proposed service schedule.
Email: sales@fastmarine.cn
WhatsApp: +86 139 2900 8160